0

1600mm L-Shaped Acrylic Shower Bath Front Panel

£147.00

1600mm L-Shaped Acrylic Shower Bath Front Panel is a practical bath panels, in European White, made from Acrylic, with height: 500 mm, width: 1600 mm, depth: 167 mm.

Description

1600mm L-Shaped Acrylic Shower Bath Front Panel is a contemporary bath panels selected for bathrooms, cloakrooms, en-suites and full renovation projects where the finish and the fitting details need to work neatly together. The supplier lists this item under Bath Panels, with a European White finish and Acrylic construction. It has been prepared for the TikiTaki Bathrooms catalogue with clear product data, customer-friendly wording and the full image set supplied in the datapack. If you are comparing several matching items, start with our showers and taps range and check the finish, connection style and measurements before placing the order.

Choosing The Right Bathroom Fitting

When choosing 1600mm L-Shaped Acrylic Shower Bath Front Panel, the main job is to make sure it suits both the design of the room and the practical way the space will be used. A European White finish can help tie together taps, valves, shower outlets, furniture handles and other visible details, especially in a bathroom where the customer wants a planned and consistent look. The product dimensions are listed as Height: 500 mm, Width: 1600 mm, Depth: 167 mm, so the item should be checked against the available space, existing pipework, wall build-up and any nearby screens, doors or storage units. This is particularly important on compact en-suites and cloakrooms, where a small projection or a slightly different shape can change how comfortable the room feels. For larger renovation projects, it is also worth checking whether the wider range has matching pieces, as this can make the finished bathroom look more deliberate and less pieced together. If you are unsure, our showroom team can help compare the item against the rest of your bathroom plan before you order.

Material, Finish And Installation Checks

The supplier describes the material as Acrylic, with a 5 Years guarantee. These details matter because bathroom products are exposed to moisture, cleaning products and regular everyday use. Before fitting, the installer should check the supplied drawing, confirm that the correct connections or fixings are available and make sure the wall, panel, tile or furniture surface is ready for installation. For showers and brassware, it is sensible to check pressure requirements and water regulations guidance before finalising a specification; an independent starting point is Water Regs UK. For accessories and furniture parts, the key checks are alignment, load, finish matching and whether the fixing surface is strong enough for the intended use. Taking these checks seriously helps reduce returns, delays and mismatched finishes on site. It also gives the customer a clearer expectation of what will arrive and how it will sit within the completed bathroom.

Ordering With A Full Bathroom Project In Mind

1600mm L-Shaped Acrylic Shower Bath Front Panel can be ordered as a single replacement item, but it is often best considered as part of the wider bathroom. Matching finishes, correct measurements and realistic delivery planning make the whole project smoother. If you are buying for a renovation, think about the other visible items in the room, including the shower screen, taps, basin area, wall panels, flooring and heated towel rail. Where a fitter is involved, share the product link and image set before the work starts so they can confirm access, fixings and any compatibility questions. TikiTaki Bathrooms can also supply products alongside a complete bathroom renovation, which is useful when you want product choice and installation planning handled together. For trade customers, the SKU and technical details in this listing make it easier to match the item to a quote, invoice or repeat order without relying on a vague product description.

Additional information

SKU WBS303
Brand Nuie
Product type Bath Panels
Colour European White
Finish European White
Material Acrylic
Style Contemporary
Guarantee 5 Years
Dimensions Height: 500 mm, Width: 1600 mm, Depth: 167 mm

Customer Review

5 star
0%
4 star
0%
3 star
0%
2 star
0%
1 star
0%

There are no reviews yet.

Review This Product

Be the first to review “1600mm L-Shaped Acrylic Shower Bath Front Panel”

Your email address will not be published. Required fields are marked *

Add photos

Picturesmax size:1024 KBmax files:4

You may also like...

Get Your Bathroom Quote

Complete the form below and our team will review your bathroom enquiry.

1
Scan the code